Dariyapur bypass drain work sends Pratapgarh traffic through Munshiganj

Heavy traffic of trucks, cars and two wheelers at a highway underpass in India

What happened: Work to build a drain has started on the Dariyapur bypass on the Lucknow-Prayagraj highway in Raebareli, Dainik Bhaskar reported on Tuesday, 17 November 2026. The bypass used to flood with rain water every monsoon. One side of the bypass is now closed for the work. Crews are also filling potholes that formed on the bypass, which was built at the time of the Kumbh. Heavy and light vehicles heading towards Pratapgarh have been diverted through Munshiganj town. This has caused traffic jams in the Munshiganj market.

Why it matters: The Dariyapur bypass carries a large share of traffic between Lucknow and Prayagraj. If you drive a truck, bus, car or two wheeler towards Pratapgarh, your trip now passes through narrow market roads. Shopkeepers and shoppers in Munshiganj face slow traffic, noise and dust during the day. School vans, ambulances and office commuters on this stretch may lose time at peak hours. Once the drain is ready, the bypass should stay open during heavy rain next year and spare residents near Dariyapur from water on the road. Local people have asked that the work be finished quickly so that traffic can return to the bypass.

Honest opinion: A drain on this stretch meets a long standing need, and starting it in the dry months makes sense. The report does not say which agency is doing the work, what it costs, or when it will end. It also does not mention a traffic plan, such as police at Munshiganj crossings or fixed hours for heavy vehicles. Without these, jams in the market are likely to continue each day the diversion lasts. The pothole repairs are welcome, but the next monsoon will show whether the new drain works. Expect the diversion to last at least a few weeks. Watch for a written traffic advisory from the police or the highway agency.

What readers should do: If you travel towards Pratapgarh, leave early and avoid the Munshiganj market between 10 AM and 1 PM and in the evening rush. Heavy vehicle drivers should follow the diversion signs and police directions and not park on market roads. Report broken diversion signs, unsafe pits or long jams on the IGRS Jansunwai portal or the CM Helpline 1076.

Sources: Dainik Bhaskar (Raebareli), 17 November 2026, 9:22 AM IST, Drain work begins on Dariyapur bypass, diversion causes jams in Munshiganj market.

Image: Fahad Puthawala / Pexels

Image used just for representational purposes only and it may, or may not, have any relevance to the story.